01483 685220  info@transportpi.co.uk

North Crescent

Case Study

South Eden Park Road

The Project

The project involved the preparation of a Transport Statement to support the scheme from a highways and transport perspective. This included vehicle swept path analysis of the basement car park/garage layout to ensure that a large family car could manoeuvre along the access ramp and return to the highway in a forward gear. The project was granted planning approval in October 2016.


South Eden Park Road

Location

South Eden Park Road, Beckenham, Bromley

Client

Northern Land Developments Limited

The Scheme

This scheme proposed the demolition of two existing dwellings and the construction of a curved crescent of seven new dwellings and associated basement car parking. The site is located adjacent to North Drive and South Eden Park Road in the London Borough of Bromley. Access was made from North Drive through an informal access driveway.

Our Role

Transport Statement including trip generation and vehicular swept path analysis.


Data Sheet

pdf icon